Project Description
We have been serving you for years in the production of renewable energy for energy.
Geris Wind Power Plant is located in Bodrum district of Muğla. The power plant belonging to Aytemiz Petrol Electricity Group has an installed power of 11.20 MWe. 4 Nordex wind turbines were used in the RES. Geriş Wind Power Plant can meet all the electrical energy needs of 7,649 people in their daily lives (such as housing, industry, metro transportation, government offices, environmental lighting) with an average electricity production of 27,780,822 kilowatt-hours. When only residential electricity consumption is taken into account, Geriş Wind Farm produces electricity that can meet the electrical energy needs of 9,301 houses.