Project Description
We have been serving you for years in the production of renewable energy for energy.
Aliağa Bergama Wind Power Plant (WPP) It is located in the Atcilar region of Bergama district of Izmir. Bergama RES Enerji Üretim A.Ş., a subsidiary of Bilgin Energy. The power plant operated by has an installed capacity of 120 MWe. 46 Nordex wind turbines were used in the RES. With an average electricity production of 286,151,239 kilowatt-hours, Bergama Wind Power Plant can meet all the electrical energy needs of 78,786 people in their daily lives (such as housing, industry, metro transportation, government offices, environmental lighting). Considering only the residential electricity consumption, Bergama Wind Power Plant produces electricity that can meet the electrical energy needs of 95,799 houses.