Project Description
We have been serving you for years in the production of renewable energy for energy.
Arapgir Wind Power Plant is 6.5 kilometers from the district center. Two more wind turbines will be added to the power plant, which is located in the Arapgir district of Malatya, at the road junction of Karayolu Onar Mahallesi, and is planned to consist of a total installed power of 10 MWe. Tunna Enerji Üretim Sanayi ve Ticaret A.Ş. is located in the Gülümüsağı neighborhood, which is approximately 22 kilometers away from Malatya city center. Work continues on the Gülümüsağı wind power plant project, in which 12 turbines will be located in Beydağı.